UNIT 66 - DATABASE CREATION
A. INTRODUCTION
- an FRS establishes:
- the products to be generated by the system
- the data needed to generate the products
- the functions which must operate on the data
- working from the outline provided by the FRS, the data
base design and creation process begins
- this unit examines the management and planning
issues involved in the physical creation of the
database
- note that specific implementation details will not be
reviewed as these are highly dependant on the particular
GIS used
- emphasis is on databases for resource management
applications
- databases for facilities management are often
extensions of existing non-geographic databases
- depend too much on specifics of systems
- the key individual involved at this stage is the Database
Manager or Coordinator who is responsible for:
- definition of database contents and its "external
views"
- see Unit 43 for a discussion of the different
"views" of a database
- maintenance and update control
- day-to-day operation, particularly if database is
distributed over a network
B. DATABASE DESIGN
- provides a comprehensive framework for the database
- allows the database to be viewed in its entirety so that
interaction between elements can be evaluated
- permits identification of potential problems and design
alternatives
- without a good database design, there may be
- irrelevant data that will not be used
- omitted data
- no update potential
- inappropriate representation of entities
- lack of integration between various parts of the
database
- unsupported applications
- major additional costs to revise the database
Stages in database design
- recall from Unit 10, that steps in database design are:
1. Conceptual
- software and hardware independent
- describes and defines included entities and spatial
objects
2. Logical
- software specific but hardware independent
- determined by database management system (discussed
in Unit 43)
3. Physical
- both hardware and software specific
- related to issues of file structure, memory size and
access requirements
- this unit focuses mainly on this last stage
C. ISSUES IN DATABASE CREATION
- what storage media to use?
- how large is the database?
- how much can be stored online? what access speed is
required for what parts of the database?
- how should the database be laid out on the various
media?
- what growth should be allowed for in acquiring
storage devices?
- how will the database change over time?
- will new attributes be added?
- will the number of features stored increase?
- how should the data be partitioned - both geographically
and thematically?
- is source data partitioned?
- will products be partitioned?
- what security is needed?
- who should be able to redefine schema - new
attributes, new objects, new object classes?
- who should be able to edit and update?
- should the database be distributed or centralized?
- if distributed, how will it be partitioned between
hosts?
- how should the database be documented?
- who is responsible for maintaining standards of
definition? standards of format? accuracy? should
documentation include access to the compiler of the
data?
- how should database creation be scheduled?
- where will the data come from?
- who determines product priorities?
- who is responsible for scheduling data availability?
- the following sections address some of these questions
D. KEY HARDWARE PARAMETERS
Volume
- databases for GIS applications range from a few megabytes
(a small resource management project) to terabytes
- a small raster-based project using IDRISI, 100 by
200 cells, 50 layers might require 10 Mbytes
database on a PC/AT
- a mid-sized vector-based project for a National
Forest using ARC/INFO might require 300 Mbytes
- a national, archival database might reach many
hundreds of Gbytes
- the spatial database represented by the currently
accumulated imagery of Landsat is order 1013 bytes
Access speed
overhead - Storage media
- data which can be accessed in order 1 second is said to
be "on-line"
- to be on-line, data must be stored on fixed or
removable disk
- relative to other forms of permanent storage, disk
costs are high, and there is an effective upper
limit of order 100 Gbytes for on-line storage when
using common magnetic disk technology
- "archival" data (data which is comparatively stable
through time) can be stored off-line until needed
- only extracts will be on-line for analysis at any
one time
- archival systems incur additional time to mount
media on hardware
- access time to extract subsets from archival data
once mounted is order 1 minute
- archival media:
- magnetic tape
- removable disk
- CD-ROM
- no ability to edit data once written - this is
acceptable for many types of geographical data
- copies are very cheap
- optical WORM (Write Once Read Many)
- "video" tape
- automatic multiple storage and access systems increase
capacity and decrease access time
- magnetic tape stores can be automated, raising
effective capacity to 1 Tbyte (order 10,000 tapes)
- order 10,000 tapes is also an effective upper
limit to the size of a (conventional, manual
mount) tape library
- optical WORM libraries can be automated much more
easily using "jukebox" technology - automatic
selection and mounting of platter
- devices to mount cassette tapes automatically are
also available
Network configuration
- should database be centralized or distributed?
- there are two answers:
1. all departments share one common database, or
2. parts of the database exist on different
workstations in an integrated network
- each department responsible for maintaining its
own share of the database
- optimizes use of expertise
- with modern technology (e.g. NFS (Network File System))
user may be unaware of actual location of data being used
- some workstations may be "diskless", owning no part
of the database
- distributed databases require careful attention to
responsibilities, standards, scheduling of updates
E. DATABASE REDEFINITION
- in some applications, all files, attributes, objects can
be anticipated when the database is defined
- e.g. systems for facilities management typically do
not allow redefinition of the database structure by
user
- other applications, particularly those involving
analysis, require ability to define new objects,
attributes
- this capability is generally important in resource
management applications
- important to determine who is allowed to change the
database definitions
- database administrator only?
- project manager only?
- any user?
F. TILES AND LAYERS
- many spatial databases are partitioned internally
- partitions may be defined spatially (like map
sheets) or thematically or both
- the term tile is often used to refer to a geographical
partition of a database, and layer to a thematic
partition
Reasons for partitioning
- capacity of storage devices
- may limit the amount of data that the system can
handle as one physical unit
- update
- easier to update one partition (e.g. map sheet) at a
time
- access speed
- may be faster if only one partition is accessed at a
time
- distribution
- easier to copy a partition than to extract part of a
larger database
- e.g. US Bureau of the Census chose to partition
its TIGER files by county for distribution
based on user needs
- e.g. US Geological Survey partitions digital
cartographic data by 1:100,000 map sheet
- user needs
- users need certain combinations of geographical area
and theme more commonly than others
- illustrated by the conventional arrangement of
topographic and thematic map series
- e.g. soils information is not normally shown on
standard topographic maps
- the best source of usage patterns is conventional
cartographic products because their traditions have
been established through continual usage and
improvement
"Seamless" databases
- despite the presence of partitioning, system designers
may choose to hide partitions from the user and present a
homogeneous, seamless view of the database
- e.g. are systems available to automatically mosaic
Landsat scenes, so users can work independently of
normal scene boundaries
- in seamless databases, the data must be fully edgematched
- parts of an object which span geographical
partitions must be logically related
- features which extend across tile boundaries
must have identical geographic coordinates and
attributes at adjacent edges
- every object must have an ID which is unique
over the whole database
- the term Map Librarian is commonly applied to systems
which remove partitions from the user's view of the
database
Organizing data into layers
- the source documents (maps) generally determine the
initial thematic division of the data into layers
- these initial layers need not coincide with the way
the data are structured internally
- e.g. the application may consider lakes and
streams as one layer while the data structure
may see them as two different objects -
polygons and lines
- several distinct layers may be available from the same
map sheet
- e.g. topographic maps may provide contours, lakes
and streams (hydrography), roads
- the Database Manager may choose to store these as
different thematic partitions in the database
- when deciding how to partition the data by theme, need to
consider:
- data relationships
- which types of data have relationships that need to
be stored in the database
- these will need to be on the same layer or stored in
such a way that relationships between them can be
quickly determined
- functional requirements
- what sets of data tend to be used together during
the creation of products
- it may be more efficient to store these on one
layer
- user requirements
- how diverse will the users requirements be
- more diversity may require more layers to allow
flexibility
- updates
- data which needs to be updated frequently should be
isolated
- common features
- features which are common to many coverages, such as
shorelines and rivers, may be stored separately then
used to create other coverages that incorporate
these lines as boundaries
- internal organization of layers depends on the system
chosen
- CAD systems treat each class of object as a separate
layer
- many raster systems treat each attribute as a
separate layer, although objects may have many
attributes
- some newer GIS designs avoid the concept of layers
entirely, storing all classes of objects and their
interrelationships together
Selecting tile configurations
- tiles may cover the same area throughout the database, or
they may have variable sizes
- fixed size tiles are:
- generally inefficient in terms of storage since some
tiles will have lots of data and others very little
- good when data volume changes through time since it
is not necessary to restructure tiles with updates
- variable size tiles are:
- efficient in term of storage
- difficult to restructure if new data is added
- boundaries may be:
overhead - Tiling Variations
- regular
- e.g. based on map sheet boundaries
- free-form
- e.g. based on political or administrative
boundaries, watersheds, major features like
roads or rivers
- tile sizes and boundaries can be chosen based on:
- areal extent of common queries or products
- scale needed in output
- balance between getting the largest areal coverage
possible and speed of processing
- practically speaking, in most databases, partitions
correspond to conventional map sheet boundaries, e.g. 7.5
minute quadrangles
- products will likely be created one tile at a time
- e.g. a forest manager wants maps of timber inventory
at a scale of 1:24,000
- the size of plots is limited by the plotter itself,
and by physical constraints on handling and storage
- it makes sense to generate timber inventory maps in
7.5 minute quadrangles
- since data will be input from quadrangles, why not
tile the entire database in quadrangles as well?
- however, a Map Librarian will be needed when small-
scale products have to be generated using many tiles
at once
G. DATA CONVERSION
- the process of data input to create the database is often
called data conversion
- involves the conversion of data from various sources
to the format required by the selected system
- previously have examined the different ways of inputting
data and various data sources
- consideration of these options is critical in
planning for database creation
- Unit 7 discusses several issues related to
integrating data from different sources
- often there are several alternative sources and input
methods available for a single dataset
Database requirements
- need to consider database requirements in terms of:
- scale
- accuracy
- scheduling priorities
- cost
- scale
- FRS specifies the scale required for output
- will determine the largest scale that is required
for datasets
- may not need to go to added expense and time to
input data at larger scales
- accuracy
- required accuracy will determine the quality of
input necessary and the amount of data that may be
created
- e.g. coarse scanning or digitizing versus very
careful and detailed digitizing
- e.g. field data collection versus satellite
image interpretation
- scheduling priorities
- some datasets will be critical in the development of
later datasets and early products
- these may justify expensive input methods or
the purchase of existing sources
- alternatives for creating the database include:
- obtaining and converting existing digital data
- manual or automated input from maps and field
sources
- contracting data conversion to consultants
In-house conversion
- data entry is labor intensive and time consuming
- some GIS vendors assist in the conversion effort,
and there are a number of companies which specialize
in conversion
- some agencies do their conversion in-house, but
there is a reluctance to do so, in many cases, as
the added personnel may not be needed once the
initial conversion is complete
- advantages of in-house conversion
- agency personnel, who are familiar with the "ground
truth" and unique situations of the areas of
interest, are able to supervise the conversion
effort
- this can be important for unanticipated
situations in which general rules cannot be
uniformly applied
- auxiliary maps and data are available if needed for
interpretation
- if the maps are sent out for digitizing, what
you send is all you get
- in-house validity checks can be made more easily
- disadvantages of in-house conversion
- additional equipment and personnel need to be added
to the project plan
- long-term commitment to full-time employees can be
expensive
H. SCHEDULING DATABASE CREATION
- database creation is a time-consuming and expensive
operation which must be phased over several years of
operation
- the total cost of database creation will likely
exceed the costs of hardware and software by a
factor of four or five
- e.g. over a 5 year period, of a total $5
million cost of a typical GIS project for
resource management, $4 million went to data
collection and entry, only $1 million to
hardware, software, administration, application
development
- since the benefits of the system derive from its products
- database creation must be scheduled so the system
can produce a limited number of products as quickly
as possible
- however, benefits will not be realized at the full
rate until the database creation is complete
- need to know the complexity of data on each input source
document to forecast data input workload
- e.g. numbers of points, polygons, lengths of lines,
number of characters of attribute
Scheduling issues
- to generate a tile of a product, the required data layers
for the correct tile must have been input
- to determine the order in which datasets must be input,
must rank products based on:
1. perceived benefit
2. cost of necessary input
- highest ranked are those with high benefit, low
cost of necessary input
- lowest ranked are low benefit, high data input
cost
- some layers may be used by several products -
once input, the cost to other products is nil
- the promotional benefit of a product is highest for a
single tile, decreases for subsequent tiles
- a single tile of a product can be used to "sell" the
system, draw attention to its possibilities
- high priority needs to be given to generating a
product which can "sell" the system within each
department or to each type of user
- need to know the payoffs between
1. producing a single tile of a new product and
2. producing further tiles of an existing product
- determining priorities under the constraint of data input
capacity is a delicate operation for the Database Manager
- many layers of data may not exist, may have to be
compiled from air photos or field observation
- the schedule for data input will have to accommodate
availability of data as well as product priorities
I. EXAMPLE - FLATHEAD NATIONAL FOREST DATABASE
Background
- Flathead NF located in Northwestern Montana on west slope
of Continental Divide
- adjacent to Glacier National Park
- headquarters in Kalispell, MT
- total area within Forest boundary is 2,628,705 acres
(1,063,822 ha)
- Forest area spread over 133 1:24,000 (7.5 minute)
quadrangles
- resource management responsibilities include:
timber fisheries
wildlife water
soils recreation
minerals wilderness areas
rangeland fire
plus maintenance of Forest infrastructure
(engineering)
- substantial investment in use of Landsat imagery for
forest inventory and management, using VICAR image
processing software
- FRS conducted in 1984/5, planning period extended to 1991
- important to note that this plan considers the needs
of Flathead NF in isolation
- may not be compatible with the national needs
of the Forest Service or the national policy
developed under the National GIS Plan
- may conflict with emerging concepts of service-
wide Corporate Information (see Unit 71)
Examples of products
Proposed database contents
- total of 58 input datasets required
- total database volume estimated at 1 Gbyte
- 12 already in digital form in VICAR image processing
system, running on mainframe outside Forest
- 3 interpreted from Landsat, available in raster form
- 9 digitized in vector form, rasterized by VICARS
- 2 are large attribute files (forest stand attributes,
transportation data for roads) maintained as System/2000
database outside Forest
- all remaining datasets must be derived from non-digital
maps or tables
- map scales range from 1:24,000 to 1:250,000
- datasets vary in complexity
- number of map sheets varies depending on scale
Example dataset characteristics
Tiling
- 1:24,000 7.5 minute quadrangle dominates both input and
output requirements
- therefore, makes sense to use quadrangles as tiles
in the database if it must be tiled (depends on
system chosen)
- could use aggregations of 7.5 minute quadrangles,
e.g. 15 minute quadrangles
Database creation plan
- needed to:
- assign input data to object types, layers
- determine which relationships to store in the
database
- determine naming conventions for files, attributes
- scheduled input of data from 3,162 individual map sheets
over 6 years
- need to allow for updates as well as initial data
input
- some layers updated on a regular basis - e.g.
timber harvesting
- some irregularly - e.g. forest fires
System specific issues
- preferred arrangement is a centralized database at Forest
headquarters, access from workstations across the Forest
- implementation plan is based on scheduled generation of
products
- system design provides little access to the database
in query mode
- therefore product generation can be batched and data
need be online only during product generation
- however 1 Gbyte is easily accommodated online
Schedule
- database creation schedule determines ability to generate
products
- FRS calls for generation of 4,513 individual map
products and 3,871 list products in same 6 years
- digitizing need will be heaviest at beginning of
period
- ability to produce will be highest at end
- input phasing:
- roads, PLSS section boundaries - all input in year 1
- lakes and streams - phased over years 2-4
- forest stands - phased over years 2-4
- harvest areas - input to begin in year 4
- over the 6 years of database creation there will be
increasing output, diminishing input
REFERENCES
ACSM-ASPRS GIMS Committee, 1989. "Multi-purpose Geographic
Database Guidelines for Local Governments," ASCM
Bulletin, Number 121:42-50. Provides a general outline
for the consideration of scale and content for municipal
GIS databases.
Calkins, H.W., and D.F. Marble, 1987. "The transition to
automated production cartography: design of the master
cartographic database," The American Cartographer 14:105-
119. Stresses the need for rigorous database design and
illustrates the use of the entity-relationship model for
spatial databases.
Nyerges, T.L., 1989. "Schema integration analysis for the
development of GIS databases," International Journal of
Geographical Information Systems 3:152-83. Describes
methods for analyzing the differences and similarities
between two or more databases
Nyerges, T.L., and K.J. Dueker, 1988. "Geographic Information
Systems in Transportation," US Department of
Transportation, Washington, DC. Report describes the
potential use of GIS in State Transportation offices and
the types of data and functionality that would be
required.
Tomlinson Associates Inc., 1985. Advanced geographic
information systems workloads analysis: Flathead
National Forest individual forest report. Report to US
Forest Service.
EXAM AND DISCUSSION QUESTIONS
1. Discuss the advantages and disadvantages of distributed
vs. centralized databases for resource management agencies.
2. Most applications of GIS for resource management to date
have been developed around a dedicated host, rather than
sharing space on a general-purpose mainframe. In fact the
development of minicomputers in the late 1970s gave a
tremendous boost to GIS because it made dedicated computers
available at costs which were within the range of many
agencies. Why do GIS developers prefer a dedicated host?
Are these arguments compatible with the idea of a database
distributed over a network?
3. Describe the functions of a Database Manager for a GIS
installation.
4. Despite the importance of design in GIS databases, there
is remarkably little literature on the topic at this time.
Why?
5. The Caribou product for the Forest Service calls for
information on elevation and aspect. What are the different
sources and data models which could be used to provide this
information? What effects might each choice have on the
generation of the product?
6. Suppose the Forest Service determined that its GIS would
be implemented in query rather than product mode, i.e. it
would train its managers to work directly with the database,
instead of defining products for the system to generate.
How would you go about identifying the input and output
requirements of a query based system? What other items
would be important in system planning?
Back to Geography 370 Home Page
Back to Geography 470 Home Page
Back
to GIS & Cartography Course Information Home Page
Please send comments regarding content to: Brian
Klinkenberg
Please send comments regarding web-site problems to: The
Techmaster
Last Updated: August 30, 1997.